The only document written to be checked, not believed

Technical specification writing services
for statements a tester can pass, a builder can build from, and a business can hold you to.

A technical specification is the only document here written to be checked rather than believed. Its unit of quality is the testable statement, not the good sentence — and its defect is ambiguity: a line two competent engineers read differently is a fault in the document, not a disagreement between readers. So the craft is turning intentions into statements somebody can prove.

Every requirement stated as a checkable claim. Every term defined once. Every line traced to who asked and how it will be proved. Three readers served from one document — the builder, the tester, the business. And change control, because a document that moves quietly is a plan nobody agreed to.

WHAT THE WORK IS 01 / 04

A sentence that two competent engineers read differently is a fault in the document. Ambiguity is the defect.

  • 01 The registerCheckable claims.
  • 02 The glossaryTerms defined once.
  • 03 The testsHow each is proved.
Every statement testable Terms defined once Traced to source Change controlled

The Writely difference

A specification is written to be checked — which makes its quality measurable, and its defect precise.

That makes it the least literary and the most demanding writing here. Nothing in a specification may be admired; everything in it must be usable — by the person who builds it, the person who proves it, and the person who bought it.

Write statements that can be tested

'The system should respond quickly' is not a requirement; it is a wish with a comma. It fails the only test that matters: a person who was not in the room cannot pass it or fail it. The same claim written as 'returns the search results within 500ms at the 95th percentile under a load of 200 concurrent users' can be proved or disproved by a stranger — a number where the claim needs one, a condition under which it applies, and a way of observing the result. That move is the whole of the work. You can also explore character bible development.

Define every term once

Most failed specifications break on a word. 'User' to the business is a customer; to the engineers it is a login. 'Order' means three things across sales and fulfilment. A term that cannot be defined in one sentence is two terms, and the glossary is where that gets settled — every term defined once, with its synonyms banned, and the places the document uses the word rather than the term marked. The glossary is not a courtesy; it is the defence against ambiguity, the defect this whole page is about.

Trace every line to a source and a test

Every requirement carries its number, its source, and its destination: who asked for it, when, and how it will be proved. The traceability is what makes the document a working instrument rather than a description — it answers the two questions any reader can ask of any line. Why does this exist? Because the finance team asked for it in March. How do we know it is done? Because the tester can pass or fail it against the acceptance map. A line that answers neither is not a requirement; it is an observation.

Change control is the craft

Specifications move, because the thing they describe is being discovered — and a document that moves quietly is a plan nobody agreed to. Every quiet edit is an argument finished without the people who lost it, and the build inherits the disagreement at a hundred times what it takes to settle it on the page. So every change is versioned, rationalised, and impact-assessed, and the log records what changed and what it affects. With that discipline the specification is the arbiter everybody refers to; without it, it is a description of a decision nobody made.

Find what your specification is missing

Eight things a specification has to settle, and the version with a summary settles three.

None of these are about being thorough. They are about whether a stranger can build from the document, prove against it, and be held to it.

Turn every intention into a claim

The register is the heart of the document, and every line in it has to survive the stranger test: can a person who was not in the room pass it or fail it. So each intention is written with its number, its condition, and its observable result, and the ones that cannot be written that way are sent back to the decision-makers rather than smoothed over in prose. 'Fast' is not a number; 'secure' is not an observable result. The register that sends the vague claims back is the register the build can use.

Define every term once

The glossary is the defence against the defect this form exists to prevent. Every word the document depends on is defined in one sentence, its synonyms are named and banned, and the places where two teams mean different things by it are marked on the page. The test of a definition is the same as the test of a requirement: a stranger reading it knows what to build, what to check, and what to reject. A term that cannot be defined in one sentence is two terms, and the glossary is where the document says so.

Trace every requirement

Every line carries who asked for it and how it will be proved, and the pair is more valuable than either alone. The source stops the requirement drifting into folklore — twelve months later nobody remembers whether the export button was a real need or one person's afternoon. The test destination stops the requirement being decorative, because a line nobody can prove is a line nobody can finish. Together they are what makes the document usable in a meeting, on a Friday, when somebody asks why.

Serve three readers at once

The builder needs the claim plain enough to build from. The tester needs it stated so it can be passed or failed. The business needs it stated so it can be held to at the end. The same line has to do all three jobs, and where the three pull apart, the document carries all three versions in one claim rather than choosing one reader. The acceptance map is where the tester's version lives; the exclusions are where the business's version lives; the register is where the builder's version lives.

The non-functional are requirements

Performance, security, privacy, accessibility, capacity, recovery time: the ones that get skipped when the money is tight and hurt when they arrive at launch. Each one is written as a checkable claim — how much, measured how, under which conditions — and given a place in the acceptance map. The pattern is always the same: the business discovers the non-functional requirement at the worst moment, when the thing is built and slow, and the only protection was writing it down in March. An adjective in the non-functional section is a defect with a longer fuse.

State the exclusions on the page

What the document does not cover is as binding as what it does, and a specification without exclusions is a promise about everything. So the exclusions are stated on the page rather than left vague: the phase that is not here, the platform that is not supported, the migration path that is not included, the thing that is explicitly somebody else's decision. The exclusions are what stop the quiet expansion of a project — the feature that arrived in week six because nobody had written down that it was never agreed.

Change control as the discipline

Every change versioned, rationalised, impact-assessed — and the log records what changed, why, and what it touches. The discipline is not bureaucracy; it is what makes the document the arbiter. The quiet edit is the mechanism by which projects fail: the requirement that softened because someone objected in a corridor, the acceptance test that moved because a date moved. The log is where the project remembers its own decisions, and it is the document that settles an argument in week thirty.

What this service cannot do

Four limits. We do not make the decisions — we write them down so they can be checked, and a specification built on guesses is a plan in a disguise. We do not advise on contract terms as lawyers do; the work writes the claims the contract points at, and names what is being excluded. We do not guarantee the thing will be built or that it will pass; the document makes the outcome checkable rather than arguable, and the testing belongs to testers. And we do not add detail that prevents no failure, because every sentence someone has to keep agreeing with is a sentence that can be contradicted later.

Read the register aloud to somebody who was not in the room. That single pass finds more faults than any review, because every question they ask is a claim the document has not made checkable yet.

A better brief, a better specification

Send the decisions, not the documents. Everything in the spec is decided by what must be proved and who must sign.

The format question comes before the message here too, and in this form the question is what has actually been decided versus what is being assumed — because a document written on assumptions is a plan in a disguise. Given the decisions, the glossary and the acceptance tests, the specification follows without further invention.

  • What has been decided, and what is assumed.
  • Who must sign off, and to what.
  • The three readers of the document.
  • The terms the teams already disagree on.
  • The non-functional requirements, with their numbers.
  • What the specification must exclude.
Share your brief
SPEC CHECK Before the writing

Six things before the writing.

Decisions apart from hopes
Glossary started
Sources named
Acceptance tests sketched
Exclusions stated
Sign-off route agreed

How the work is done

From decisions to a document the build, the test and the contract are all checked against.

Decisions, register, proofs, document. The order is not a preference. A specification written before the decisions are pulled apart is a description of hopes.

01 / THE DECISIONS

Pull the decisions apart from the assumptions

First, and nothing is written before it. The decision-makers are interviewed one by one — the business, the build, the verification side — and the register starts as two lists: what has been agreed, with the person who agreed it, and what is currently a hope. The second list is sent back for decision rather than written as prose, because a document that smooths over a guess is a plan in a disguise and the build takes it off in week six. The disagreements between the two lists are named here, with the options.

02 / THE REGISTER

Write every requirement as a checkable claim

Then the register, which is the heart of the document. Every requirement is written with its number, its source, its condition, its observable result, and how it will be proved — and the ones that cannot be written that way are sent back rather than smoothed over. Each line is tested by the stranger test: a person who was not in the room must be able to pass it or fail it. The vague claims that come back are the most valuable output of this step, because they are the decisions nobody had actually made.

03 / THE PROOFS

Build the glossary and the acceptance map

Then the two instruments that make the register usable: the glossary, with every term defined once and its synonyms banned, and the acceptance map, pairing every requirement with how it will be proved — the method, the condition, the evidence, and the person who signs. The non-functional requirements get their numbers here, and the exclusions are stated on the page rather than left vague. This is the step that decides whether the document can be checked by somebody who was never in the room.

04 / THE DOCUMENT

Assemble it, then set the change discipline

Finally, the specification itself: the structured prose built around the numbered register, written so all three readers can do their jobs from the same pages. Then the change discipline — versioning, the reason for every change, the impact note — written down before the first version goes out, because the log is what makes the document the arbiter. The stranger test is the last gate: the register read aloud to somebody who was not in the room. You can also explore thesis writing.

What actually gets handed over

Five documents. The register is the one that decides whether a specification exists at all, because a line nobody can check is not a requirement.

The specification is the visible part and it is assembled fourth. These five are what turn decisions into a document a stranger can build from, prove against, and be held to — and what keep it the arbiter after the first change.

The requirements register

Every requirement, numbered, with its source, its status, and the observable result it promises — each line written so that a person who was not in the room can pass it or fail it. The vague claims that could not be written that way are listed on their own, as decisions still to be made rather than prose to be smoothed. The register is the heart of the document and the place every later part refers back to, and it is what the build, the verification, and the contract are all eventually checked against.

The glossary

Every term the document depends on, defined in one sentence, with its synonyms named and banned and the places where two teams mean different things by it marked. A term that cannot be defined in one sentence is two terms, and the glossary is where the document says so. It is the defence against the defect this whole form exists to prevent, and it is the section that gets consulted most once the build begins — which is why it is written for the stranger rather than the meeting.

The acceptance test map

Every requirement paired with how it will be proved: the method, the condition, the evidence, and the person who signs it off. This is where the three readers of the document get what they each need — the builder sees what has to be true, the tester sees what has to be shown, the business sees what has to be delivered. The non-functional requirements carry their numbers here too, and the map is what turns the register from a list into a contract that can be finished.

The specification

The document itself, structured around the numbered register, written so that all three readers can do their job from the same pages — with the exclusions stated on the page rather than left vague, and every claim carrying its source and its test. The structure serves the reading: the register for the builder, the exclusions and the scope for the business, the acceptance map for verification. The prose is plain because a requirement that cannot be read plainly is a requirement that will be read two ways.

The change and version log

What changed, when, why, and what it affects — the discipline written down before the first version goes out, because the log is what makes the document the arbiter after the first quiet edit. Every change is traced to the person who asked for it and the part of the document it touches, and the impact note says what has to be re-checked. The log is where the project remembers its own decisions, and it is what settles an argument in week thirty without anybody having to reconstruct a meeting from memory.

The register is the part clients skip and the only document here that decides whether the specification can be checked. Claims written without it are wishes in prose, which is why so many well-organised documents are useless to the person who has to build the thing.

What a specification has to settle

Six things, and the version with a summary settles three.

Each can be checked before the writing, and each decides whether the document can be built from, proved against, and held to.

  • Every requirement stated as a checkable claim.
  • Every term defined once.
  • Every line traced to a source and a test.
  • The three readers served from one document.
  • The exclusions stated on the page.
  • Change control agreed before the first version.
THE REGISTER Six things

Six things a specification must settle.

Statements testable
Terms defined once
Lines traced
Three readers served
Exclusions stated
Change controlled

Explore related academic support

The research and the craft that turns decisions into statements that can be proved.

A specification is an argument made in advance about what a thing will do, written so that somebody can later check it. These are the pages that produce and check material of that kind, and every line in the document should be traceable to a decision, a source, and a test.

Have a project and a deadline already? Send the decisions and we will tell you what the specification can honestly hold. That is usually fewer requirements and more definitions.

Where the specifications come from

The requirements engineering body leads, because it is where the vocabulary of this craft is written down — what makes a claim testable, and why the source and destination of every line matter.

Three candidates could not be listed: the systems engineering body returned a refusal, the standards body's page for the requirements standard answered with a refusal and its home page did not answer at all, and the government content guidance did not respond from this build environment — the rule is that nothing is listed until it answers. The requirements engineering body comes first for a practical reason: the vocabulary of this craft — what makes a claim testable, what statuses a requirement has, and why the source and the destination of each line matter — is written down there, and it is the vocabulary the register is built from. Then the documentation community, where the practice of writing for engineers is argued by the people who do it. Then the style guide for technical prose, which is the plainest public statement of how a claim must be written to be usable by all of its readers. Then the most-read technical documentation in the world, whose glossary is the model for what a definition is for. Then the documentation framework, the usability research, the Nigerian computing body, and the plain writing rules, because a requirement that cannot be read plainly is a requirement that will be read two ways. Four of these eight have not appeared anywhere in this corpus before. Every resource here was confirmed to answer before it was listed. These external resources are informative references, not Writely service pages.

THE VOCABULARY OF REQUIREMENTS

IREB — International Requirements Engineering Board

The professional body of requirements engineering, and the source of the vocabulary the register is built from: what makes a claim testable, what statuses a requirement has, why the source and the destination of every line matter, and how a document stays checkable through change. The craft of this page — the stranger test, the checkable claim, the trace — is the body's published method for the most part. New to this corpus.

Open resource
THE PRACTICE OF DOCUMENTING

Write the Docs

The community where the practice of writing for engineers is argued by the people who do it — talks, guides, and years of public discussion on how a document is actually read by the people who build and check things. Included because the three readers of a specification are a documentation problem as much as a requirements problem: the builder, the tester and the business read the same pages for three different jobs. New to this corpus.

Open resource
THE RULES FOR TECHNICAL PROSE

Google Developer Documentation Style Guide

The plainest public statement of how technical writing has to be written to be usable by all of its readers: defined terms, one meaning per word, the numbered statement, the example beside the claim. Its discipline on ambiguity — why the same word cannot mean two things in one document — is the rule the glossary enforces. Included because a requirement that cannot be read plainly is a requirement that will be read two ways, and the defence is written down here.

Open resource
THE MODEL OF A GLOSSARY

MDN Web Docs

The most-read technical documentation in the world, and the public model for what a glossary is for: every term defined once, in one sentence a stranger can act on, with the synonyms marked and the boundaries drawn. Included because the glossary is the section of a specification that gets consulted most and maintained least, and this is the reference every developer already checks a definition against. New to this corpus.

Open resource
THE SHAPE OF THE DOCUMENT

Diátaxis

The documentation framework that divides the four things a technical document does — the tutorial, the how-to, the reference and the explanation — and shows why mixing them is what makes documents unusable. Included because a specification is mostly reference and explanation, and the framework's discipline about which mode a page is serving is the same discipline that keeps the three readers of a spec from arguing about what they are reading.

Open resource
HOW THE READERS READ

Nielsen Norman Group

The research on how technical readers actually read: scanning rather than reading, task orientation, the way a page is checked against a question rather than read from the top. Included because the three readers of a specification arrive with three questions and a deadline — what do I build, how do I prove it, what did we promise — and the research evidence for structuring a document around the questions rather than around its author's logic is here.

Open resource
THE COUNTRY'S COMPUTING BODY

Nigeria Computer Society

The professional body of computing in Nigeria, and the place where the practice of this trade is argued locally: the teams, the vendors, the standards, the training. Included because a specification written in this market is usually read by more people than the ones who commissioned it — contractors, client teams, regulators — and the country's own professional standards are what those readers measure the document against. New to this corpus.

Open resource
THE ACTUAL RULES

Plain language guide series

Plain rules for plain writing, and the part of this list most likely to be read and used, because the plain telling is the whole discipline of the form: a requirement that cannot be read plainly is a requirement that will be read two ways. Its rules on one meaning per word, on naming rather than pointing, and on sentences that can be read once are exactly the pass a claim needs before a tester is asked to check it.

Open resource

Local context, wider reach

Nigeria at the centre. Africa in view.

Writely is rooted in Nigeria and designed for remote academic and business support. Whether you are writing a technical specification for a product, a platform, a system, a tender, an internal build or a client project, from any city or town, or from another part of Africa or another country entirely, you can work on it here.

Remote-friendly writing support

Technical specification writing across Nigeria

Explore technical specification writing support for teams and organisations across Nigeria and wherever the work is built. Three things are genuinely different here, and all three belong in the brief before the writing rather than in a later edit. The build is usually shared: in-house teams, contractors and vendors all work from the same document, which raises what the glossary and the exclusions have to do — the person building the third module may never have met the person who built the first, and the specification is what holds the parts together. The money is watched hard, so the non-functional requirements get skipped first and hurt most later: performance and security written as checkable claims at the start are what protect the launch. And the client's signature is the contract — the document a business is held to at the end, so it is written for the person signing as carefully as for the person coding.

Lagos Abuja Port Harcourt Kano Ibadan Enugu Benin City Uyo Kaduna Calabar Jos Abeokuta Awka Akure Warri Owerri Zaria Sokoto Bauchi Maiduguri

Nigeria states and the Federal Capital Territory

Writely’s academic support is available remotely across Nigeria, including:

  • Abia
  • Adamawa
  • Akwa Ibom
  • Anambra
  • Bauchi
  • Bayelsa
  • Benue
  • Borno
  • Cross River
  • Delta
  • Ebonyi
  • Edo
  • Ekiti
  • Enugu
  • Gombe
  • Imo
  • Jigawa
  • Kaduna
  • Kano
  • Katsina
  • Kebbi
  • Kogi
  • Kwara
  • Lagos
  • Nasarawa
  • Niger
  • Ogun
  • Ondo
  • Osun
  • Oyo
  • Plateau
  • Rivers
  • Sokoto
  • Taraba
  • Yobe
  • Zamfara
  • Federal Capital Territory

Remote support across Africa

Country-level discovery

Writely welcomes conversations with students, researchers and candidates across Africa, including learners in:

Nigeria Algeria Angola Benin Botswana Burkina Faso Burundi Cabo Verde Cameroon Central African Republic Chad Comoros Côte d’Ivory Democratic Republic of the Congo Djibouti Egypt Equatorial Guinea Eritrea Eswatini Ethiopia Gabon Gambia Ghana Guinea Guinea-Bissau Kenya Lesotho Liberia Libya Madagascar Malawi Mali Mauritania Mauritius Morocco Mozambique Namibia Niger Rwanda São Tomé and Príncipe Senegal Seychelles Sierra Leone Somalia South Africa South Sudan Sudan Tanzania Togo Tunisia Uganda Western Sahara Zambia Zimbabwe

Questions, answered

Start with what you need to move forward.

If your question is not covered here, send the essentials in a chat. A precise brief usually leads to a more useful starting point.

Ask your question
What is technical specification writing, and what is it not?
It is writing the document a thing is built from and checked against: every requirement stated as a checkable claim, every term defined once, and every line traced to who asked for it and how it will be proved. Not a summary of a plan — a specification is written so that a builder can build from it, a tester can verify against it, and a business can be held to it. It is also not an essay; a document that only reads well is a document nobody can check.
What makes a requirement testable?
Three things: a number where the claim needs one, a condition under which it applies, and a way of observing the result. 'The system should respond quickly' fails all three — quickly is not a number, no load is stated, and nobody can watch it happen. 'Returns the search results within 500ms at the 95th percentile under a load of 200 concurrent users' passes all three, and a tester can pass or fail it without asking the writer what they meant. The test is a person who was not in the room.
How detailed should a spec be?
Detailed enough that a person who was never in the room can build from it, prove against it, or be held to it — and no detailed-er. Detail that prevents no failure is maintenance: every sentence someone has to keep agreeing with is a sentence that can be contradicted later. The honest level of detail is the one where the three readers stop asking questions, and the document is long enough for the requirements and short enough to be read before the build rather than after it.
What is the difference between a spec and a requirements document?
In practice: a requirements document lists what must be true, and a specification adds the numbers, the conditions and the definitions that make the list checkable. Many projects use one name for both and lose the difference in the middle — the list that says the system will be fast and secure is a requirements list; the document that says how fast, measured how, under which conditions, with each word defined, is a specification. The service builds the second from the first, and states plainly what the second adds.
Who should write the spec?
The person who can turn intent into checkable claims and who has the standing to be held to them. Sometimes that is a product owner, sometimes an engineer, sometimes a writer — and the commonest failure is the document written by the loudest person in the room rather than the person who can make it testable. What matters is that the writer can interview the decision-makers, define the terms, and produce the document the three readers can each do their job from.
How do you handle disagreements between stakeholders?
By writing both positions down, with the source of each, and making the choice a decision rather than a preference. A specification is the artefact where an argument gets finished: each requirement is traced to who asked for it, the conflicts are named on the page with the options, and the resolution is recorded with its reason. A document that hides a disagreement does not remove it; it moves the argument to the build, where the fix is harder.
What about terms that mean different things to different teams?
They go in the glossary, defined once, with the synonyms banned. Most failed specifications break on a word: 'user' to the business is a customer, to the engineers it is a login; 'order' means three things across sales and fulfilment. The glossary is not a courtesy — it is the defence against the defect this whole page is about. A term that cannot be defined in one sentence is two terms, and the document should say so.
How are non-functional requirements handled?
As requirements, with numbers, not as adjectives. Performance, security, privacy, accessibility, capacity, recovery time: each one gets a claim a tester can pass or fail — how much, measured how, under which conditions — and a place in the acceptance map. They are the first to be skipped when the money is tight and the first to hurt when they arrive, because they are what the business discovers at launch. Writing them as checkable claims at the start is the least expensive protection a project has.
How do specs handle change?
With change control, which is the craft rather than the paperwork: every change versioned, rationalised, and impact-assessed. A document that moves quietly is a plan nobody agreed to, and every quiet edit is an argument finished without the people who lost it. The log records what changed, why, and what it affects, and the specification stays the arbiter everybody refers to — because a document that is not the arbiter is a description of a decision nobody made.
Can you write it, or do we write it ourselves?
We write it, from the decisions your people have made, and you own it. What we bring is the interview discipline that turns intent into checkable claims, the glossary that prevents the word-argument, the acceptance map that makes every line provable, and the change discipline that keeps the document honest. What we cannot do is make the decisions: a specification written on guesses is a plan in a disguise, and the build will take it off.
Where is Writely available, and how do I start?
Writely is based in Nigeria and works remotely with teams and organisations across Nigeria and the rest of Africa. Use the Chat with us button to send what has been decided — even if the honest answer is 'not much yet' — and the deadline the document is working towards. If a requirements list already exists, that is the most useful thing to send, because the register and the acceptance map can be built from it rather than from a meeting.
What do I get at the end?
The specification itself, with every requirement stated as a checkable claim and numbered, plus the requirements register showing the source and status of each line, the glossary, the acceptance test map pairing every requirement with how it will be proved, and the change log with the version discipline written down. The build and the testing are not included — the document is what they are both checked against, which is the point.

Your next move

Send us the decisions, not the documents. We’ll work out what the specification has to prove.

Whether you need the intentions turned into checkable claims, the terms defined once, every line traced to a source and a test, or change control that keeps the document the arbiter, begin a clear conversation with Writely.

Request services