What is technical specification writing, and what is it not?
It is writing the document a thing is built from and checked against: every requirement stated as a checkable claim, every term defined once, and every line traced to who asked for it and how it will be proved. Not a summary of a plan — a specification is written so that a builder can build from it, a tester can verify against it, and a business can be held to it. It is also not an essay; a document that only reads well is a document nobody can check.
What makes a requirement testable?
Three things: a number where the claim needs one, a condition under which it applies, and a way of observing the result. 'The system should respond quickly' fails all three — quickly is not a number, no load is stated, and nobody can watch it happen. 'Returns the search results within 500ms at the 95th percentile under a load of 200 concurrent users' passes all three, and a tester can pass or fail it without asking the writer what they meant. The test is a person who was not in the room.
How detailed should a spec be?
Detailed enough that a person who was never in the room can build from it, prove against it, or be held to it — and no detailed-er. Detail that prevents no failure is maintenance: every sentence someone has to keep agreeing with is a sentence that can be contradicted later. The honest level of detail is the one where the three readers stop asking questions, and the document is long enough for the requirements and short enough to be read before the build rather than after it.
What is the difference between a spec and a requirements document?
In practice: a requirements document lists what must be true, and a specification adds the numbers, the conditions and the definitions that make the list checkable. Many projects use one name for both and lose the difference in the middle — the list that says the system will be fast and secure is a requirements list; the document that says how fast, measured how, under which conditions, with each word defined, is a specification. The service builds the second from the first, and states plainly what the second adds.
Who should write the spec?
The person who can turn intent into checkable claims and who has the standing to be held to them. Sometimes that is a product owner, sometimes an engineer, sometimes a writer — and the commonest failure is the document written by the loudest person in the room rather than the person who can make it testable. What matters is that the writer can interview the decision-makers, define the terms, and produce the document the three readers can each do their job from.
How do you handle disagreements between stakeholders?
By writing both positions down, with the source of each, and making the choice a decision rather than a preference. A specification is the artefact where an argument gets finished: each requirement is traced to who asked for it, the conflicts are named on the page with the options, and the resolution is recorded with its reason. A document that hides a disagreement does not remove it; it moves the argument to the build, where the fix is harder.
What about terms that mean different things to different teams?
They go in the glossary, defined once, with the synonyms banned. Most failed specifications break on a word: 'user' to the business is a customer, to the engineers it is a login; 'order' means three things across sales and fulfilment. The glossary is not a courtesy — it is the defence against the defect this whole page is about. A term that cannot be defined in one sentence is two terms, and the document should say so.
How are non-functional requirements handled?
As requirements, with numbers, not as adjectives. Performance, security, privacy, accessibility, capacity, recovery time: each one gets a claim a tester can pass or fail — how much, measured how, under which conditions — and a place in the acceptance map. They are the first to be skipped when the money is tight and the first to hurt when they arrive, because they are what the business discovers at launch. Writing them as checkable claims at the start is the least expensive protection a project has.
How do specs handle change?
With change control, which is the craft rather than the paperwork: every change versioned, rationalised, and impact-assessed. A document that moves quietly is a plan nobody agreed to, and every quiet edit is an argument finished without the people who lost it. The log records what changed, why, and what it affects, and the specification stays the arbiter everybody refers to — because a document that is not the arbiter is a description of a decision nobody made.
Can you write it, or do we write it ourselves?
We write it, from the decisions your people have made, and you own it. What we bring is the interview discipline that turns intent into checkable claims, the glossary that prevents the word-argument, the acceptance map that makes every line provable, and the change discipline that keeps the document honest. What we cannot do is make the decisions: a specification written on guesses is a plan in a disguise, and the build will take it off.
Where is Writely available, and how do I start?
Writely is based in Nigeria and works remotely with teams and organisations across Nigeria and the rest of Africa. Use the
Chat with us button to send what has been decided — even if the honest answer is 'not much yet' — and the deadline the document is working towards. If a requirements list already exists, that is the most useful thing to send, because the register and the acceptance map can be built from it rather than from a meeting.
What do I get at the end?
The specification itself, with every requirement stated as a checkable claim and numbered, plus the requirements register showing the source and status of each line, the glossary, the acceptance test map pairing every requirement with how it will be proved, and the change log with the version discipline written down. The build and the testing are not included — the document is what they are both checked against, which is the point.